Hello,
we have a Customer with a cs1000 active. Round about 500 User.
In the first Step, we want to place a ipo v2, connected over SIP or PRI with the cs1k, where the customer can play with the new pbx. At this Point, the v2 will have prefered lic with all the nice features you can have - for 20 or 30 Users.
In the second step we will plase a server Edt. and the question is: can i move the lic to the, than new, server Edt? How long take the Lic Swap normaly by avaya, wherever applicable? 1h, 1d, 1w or 1m ;-) ?
In the knowledgebase or sales portal i can´t find any infos about that. Only in the q&a for rel 9.0 describe the scearion with - "yes, it can be done"...
we have a Customer with a cs1000 active. Round about 500 User.
In the first Step, we want to place a ipo v2, connected over SIP or PRI with the cs1k, where the customer can play with the new pbx. At this Point, the v2 will have prefered lic with all the nice features you can have - for 20 or 30 Users.
In the second step we will plase a server Edt. and the question is: can i move the lic to the, than new, server Edt? How long take the Lic Swap normaly by avaya, wherever applicable? 1h, 1d, 1w or 1m ;-) ?
In the knowledgebase or sales portal i can´t find any infos about that. Only in the q&a for rel 9.0 describe the scearion with - "yes, it can be done"...