I wonder if anyone could help,
The call centre that I work in, requires that a mandatory building wiring check is carried out in the near future and a consequence of this is that the Definity G3si must be powered down and then brought back up.
I understand having read some of the replies on the forum, that it is important to power down the audix system first. Does anyone have a procedural doc for this process, or can anyone advise?
Thanks
The call centre that I work in, requires that a mandatory building wiring check is carried out in the near future and a consequence of this is that the Definity G3si must be powered down and then brought back up.
I understand having read some of the replies on the forum, that it is important to power down the audix system first. Does anyone have a procedural doc for this process, or can anyone advise?
Thanks