I know 2000 backup can't be this difficult!! Here is what I'm doing:
1. Incremental backup Mon - Thurs
2. Full Backup Friday.
I have gone through computer management and prepared all the tapes and labeled. On Monday, I put in a new tape and the incremental runs fine, however, the next night I get the error message "The operation was not performed because no unused media was available." What am I doing wrong and why is it not seeing the tape as usable, better yet, how do I prepare the tape for incremental. I can prepare the tape each day and have the backup run successful, however, it kind of defeats the purpose of a scheduled backup system. I'm using Win2k server service pack 2 on a dell poweredge 2300 with a dds3 drive. Any one have any suggestions or links to microsoft on how to properly schedule backups that will actually run???
Thanks,
Ryan
1. Incremental backup Mon - Thurs
2. Full Backup Friday.
I have gone through computer management and prepared all the tapes and labeled. On Monday, I put in a new tape and the incremental runs fine, however, the next night I get the error message "The operation was not performed because no unused media was available." What am I doing wrong and why is it not seeing the tape as usable, better yet, how do I prepare the tape for incremental. I can prepare the tape each day and have the backup run successful, however, it kind of defeats the purpose of a scheduled backup system. I'm using Win2k server service pack 2 on a dell poweredge 2300 with a dds3 drive. Any one have any suggestions or links to microsoft on how to properly schedule backups that will actually run???
Thanks,
Ryan