Hi, can someone please let me know if this is possible, if so HOW?
We have a simple server with Brightstore 11, a internal Ultrium Tape unit and 10 Tapes.
Currently the tapes are labelled "Day"Week1 & "Day"Week2.
a two week cycle.
Is there anyway we can set the job so when a backup is done the tape is actually labelled the new date, for example to would be "Monday 04 01 07".
Hope this makes sense.
Thanks
Roger
We have a simple server with Brightstore 11, a internal Ultrium Tape unit and 10 Tapes.
Currently the tapes are labelled "Day"Week1 & "Day"Week2.
a two week cycle.
Is there anyway we can set the job so when a backup is done the tape is actually labelled the new date, for example to would be "Monday 04 01 07".
Hope this makes sense.
Thanks
Roger