Hi all,
I've just aquired a new server that I intend to use to replace a box that's about 4 years old. The existing server is running NW6 SP3 so my plan was to use the Migration Wizard to achieve this.
I've tried this once and it fails at the 'Begin NDS Migration' step. Basically it runs all the way through the process and then says it can't continue. When I look in the log files there is the following error:
- (DSBackupCreate Xfffffd60 - NDS error: You don't have sufficient rights to complete the requested operation. ) BACKUP.NDS was not created.
If you search for this in the knowledge base it instructs you to backrev your version of DS to pre-November 2002. So I copied the DS.NLM from the SP2 CD (which fits in with this date) and retried the step which failed with the same error. It may be worth mentioning that I'm using the migration wizard from the original NW6 CD.
As far as the servers themselves go:
Source:
NW6 SP3
Compaq Proliant ML370 R01
P3 733, 1Gb Mem
Destination:
NW6 SP3 (Pre-Migration type)
HP Proliant DL380 G3
P4 Xeon 2.8GHz, 1.5Gb Mem
Source OS Version: 6.0
Source DS Version: 103.20
Destination OS Version: 6.0
Destination DS Version: 103.20
(The above 4 lines are from the error log).
I guess my questions are:
1) Could someone point out if I'm doing wrong above? and
2) Is there a better way of doing the migration.
Thanks for your help.
Nigel Adams.
I've just aquired a new server that I intend to use to replace a box that's about 4 years old. The existing server is running NW6 SP3 so my plan was to use the Migration Wizard to achieve this.
I've tried this once and it fails at the 'Begin NDS Migration' step. Basically it runs all the way through the process and then says it can't continue. When I look in the log files there is the following error:
- (DSBackupCreate Xfffffd60 - NDS error: You don't have sufficient rights to complete the requested operation. ) BACKUP.NDS was not created.
If you search for this in the knowledge base it instructs you to backrev your version of DS to pre-November 2002. So I copied the DS.NLM from the SP2 CD (which fits in with this date) and retried the step which failed with the same error. It may be worth mentioning that I'm using the migration wizard from the original NW6 CD.
As far as the servers themselves go:
Source:
NW6 SP3
Compaq Proliant ML370 R01
P3 733, 1Gb Mem
Destination:
NW6 SP3 (Pre-Migration type)
HP Proliant DL380 G3
P4 Xeon 2.8GHz, 1.5Gb Mem
Source OS Version: 6.0
Source DS Version: 103.20
Destination OS Version: 6.0
Destination DS Version: 103.20
(The above 4 lines are from the error log).
I guess my questions are:
1) Could someone point out if I'm doing wrong above? and
2) Is there a better way of doing the migration.
Thanks for your help.
Nigel Adams.