There is no such animal as a cs1000s 5.5 or option 81s.
All CS1000s or CS1000M (chassis or cabinet based) become a CS1000e when upgraded to 5.X. CS1000M SG or MG (options 61 or 81 respectively with a signalling server) are still CS1000M SG and MG.
As to a cost, you need to speak to several vendors. Pricing will vary based on the vendor.
Depending on the size of your system I would think between 20 and 50,000 would be in the range for moving the system, maybe more if it is a very large system. Is the MDF staying or going etc? If you were to purchase a new system it would run well over 150,000 so you need to move the system.
I would suggest a 3 day weekend. You can call me if you have any questions on my contact page.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.