Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TouchToneTommy on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Move Option 81 or Migrate to Option 81 S

Status
Not open for further replies.

ebtj

Technical User
Dec 12, 2008
78
We may be moving our systems to a new floor. is it more cost effective to move an option 81 or install a new system, like an option 81S?

Thanks
 
what does a cs1000s 5.5 cost?
 
and is there a website i can go to see estimated prices for nortel equipment?
 
There is no such animal as a cs1000s 5.5 or option 81s.

All CS1000s or CS1000M (chassis or cabinet based) become a CS1000e when upgraded to 5.X. CS1000M SG or MG (options 61 or 81 respectively with a signalling server) are still CS1000M SG and MG.

As to a cost, you need to speak to several vendors. Pricing will vary based on the vendor.
 
Depending on the size of your system I would think between 20 and 50,000 would be in the range for moving the system, maybe more if it is a very large system. Is the MDF staying or going etc? If you were to purchase a new system it would run well over 150,000 so you need to move the system.

I would suggest a 3 day weekend. You can call me if you have any questions on my contact page.

Signature===========================================

Aastra Authorized Reseller
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top