Hi All:
I've just installed Crystal Passage in order to schedule some redudant reports for our 6 offices. However, each time I try to schedule a report it shuts down. I doesn't give a reason. I've checked everything from the ODBC connection to the location of the reports. I'm at a loss.
The message is "Crystal Passage - Crystal Reports Scheduler has encountered a problem and needs to close."
I'm using CR 8.5
ODBC to SQL Server
Can anyone shed some light?
Thanks,
-L
-LLL
I've just installed Crystal Passage in order to schedule some redudant reports for our 6 offices. However, each time I try to schedule a report it shuts down. I doesn't give a reason. I've checked everything from the ODBC connection to the location of the reports. I'm at a loss.
The message is "Crystal Passage - Crystal Reports Scheduler has encountered a problem and needs to close."
I'm using CR 8.5
ODBC to SQL Server
Can anyone shed some light?
Thanks,
-L
-LLL