There is a problem in the SQL database the date needs to be bumped forward. Try this.
RCC / Contact Center data stopped downloading at a specific date. Need to bump Enddate. (BCM, CallPilot 150)
Rate this Page
Doc ID: SOLN217915
Version: 5.0
Status: Published
Published date: 08 Jan 2013
Updated: 03 Mar 2014
Author: Marcel Comeau
Details
• Reporting for Contact Center (RCC) reporting frozen on date.
• BCM400/BCM200/BCM1000 4.0, BCM50, BCM450 or CallPilot 150 using RCC 2.45+
________________________________________
Problem Clarification
Contact Center data status is green but no data is being downloaded past a certain date.
Cause
Call Detail Recording (CDR) data corruption.
Solution
Moved pass corrupted data / Contact Center data download resumed.
Please contact your business partner or Avaya support to resolve.
Restricted Solutions Elements
How to Bump Enddate for RCC through Command Prompt.
Open a command line and run each of those commands
1. cd Program Files\Microsoft SQL Server\90\Tools\Binn
2. Use one of these command. If it gives an error, try another.
o sqlcmd –S.\SQLEXPRESS –E
o sqlcmd –S.\RCCSQLEXPR –E
o sqlcmd -S.\SQLEXPRESS -dmaster -Usa -PYR46L43!
o sqlcmd -S.\RCCSQLEXPR -dmaster -Usa -PYR46L43!
3. use ccrdb
4. go
5. select * from rptrequesttimes
6. go
Have a look at the enddat, it is probably wrong. Resent the end date/time to a value later than the stuck date/time.
7. update rptrequesttimes set enddate=’2010-01-02 15:00:00’
8. go
Then, refresh the request times by doing:
9. select * from rptrequesttimes
10. go
==> do 9 and 10 over and over to see that the endtime is progressing, untilthe enddate is at the