JoeatTrends
Programmer
For our main line we have a VDN and Vector setup with a rule to forward to a "we are closed" announcment if the time of the day is outside the business hours.
With the Daylight savings finally figured out (it increments forward not backwards the way it feels for me in real life anyway) it now is not accounted for in the vector. ie. System time on the Definity 8700 is 7:30 am , daylight savings is in effect so it is really 8:30 am. The vector however says that the office is closed still though even though it is set to open at 8:30.
Is there a solution to this, or am I the only one who has experienced this? I think I may just go back to manually changing the time twice a year instead of manually changing my vector twice each year. Thanks for any help.
With the Daylight savings finally figured out (it increments forward not backwards the way it feels for me in real life anyway) it now is not accounted for in the vector. ie. System time on the Definity 8700 is 7:30 am , daylight savings is in effect so it is really 8:30 am. The vector however says that the office is closed still though even though it is set to open at 8:30.
Is there a solution to this, or am I the only one who has experienced this? I think I may just go back to manually changing the time twice a year instead of manually changing my vector twice each year. Thanks for any help.