Hi all,
I think that maybe the subject line sayes it all but I was wondering is it possibel to run a report based on a calendar I have defined in CE10. It would run from the last day till the day it is running.
Thanks but I'm not expecting too much back. It might be a challange for someone.
Fergal
I think that maybe the subject line sayes it all but I was wondering is it possibel to run a report based on a calendar I have defined in CE10. It would run from the last day till the day it is running.
Thanks but I'm not expecting too much back. It might be a challange for someone.
Fergal