Our datacenter has been asked to support an application running Oracle 10g rac. After talking with our Veritas reps it appears that I will need to upgrade to NBU Ent 5.0 SP1. I'd be most interested to hear how others have made out with this upgrade. The first Server to be upgraded will be our MoM which is runnning GDM, NBAR and Vault on a Sun V880 (Solaris 8). By the time the upgrade takes place I imagine BMR will be congigured on this machine as well. Our tape backup libraries is an ADIC Scalar 1000, soon to be joined with an ADIC i2k, and an EMC Clariion as a DSU (future DSSU).
We have been running with minimal issues less a fix to Exchange 5.5 bricklevel backups in FP3 and 5 (yes, there is a binary fix to patch FP6).
Suggestions and recommendations on how to proceed are greatly appreciated. Thank you in advance.
We have been running with minimal issues less a fix to Exchange 5.5 bricklevel backups in FP3 and 5 (yes, there is a binary fix to patch FP6).
Suggestions and recommendations on how to proceed are greatly appreciated. Thank you in advance.