I have a very simple report based on the data from an Excel worksheet. I created the report several weeks ago and have since added a number of items to the excel worksheet. When I refresh the changes do not appear. I have a feeling that the probelm is due to the worksheet using linked fields. Basically I have 9 worksheets and a final "ALL" worksheet that includes the data from the worksheets by linked fields. Simply a copy and "paste link" setup.
Is there a way to get the report to update correctly or will I need to re-create the report?
Thanks,
Bill
Is there a way to get the report to update correctly or will I need to re-create the report?
Thanks,
Bill