Hey guys,
Just want to know if you think there are any issues with this setup:
Room 1: Gig Switch with 2 other connected directly to it.
Room 2: Gig Switch with 4 other sitches directly connected ot it
Room 1 & 2 are connected by a connection between the two 2 gig switches.
There isn't a problem connecting the 4 switches into 1 gig switch in room 2 right? Do don't have to take them and daisy chain them down do you?
Thanks!
Just want to know if you think there are any issues with this setup:
Room 1: Gig Switch with 2 other connected directly to it.
Room 2: Gig Switch with 4 other sitches directly connected ot it
Room 1 & 2 are connected by a connection between the two 2 gig switches.
There isn't a problem connecting the 4 switches into 1 gig switch in room 2 right? Do don't have to take them and daisy chain them down do you?
Thanks!