ptheriault
IS-IT--Management
Has anyone ever started a profiler trace from a scheduled job?
Here is my problem.. I have a job that runs at 2 AM. It is very I/O intensive so I can't run it during the day. For the past few days it has been loosing it's connection. I don't understand why since it is only transforming data from one database and inserting it into another db on the same server. I was going to run a trace against it to see if I can find where the connection is being dropped. I just don't want to wake up at 2 AM to do it. I would like to configure my trace file and schedule it to run.
Can anyone help?
Here is my problem.. I have a job that runs at 2 AM. It is very I/O intensive so I can't run it during the day. For the past few days it has been loosing it's connection. I don't understand why since it is only transforming data from one database and inserting it into another db on the same server. I was going to run a trace against it to see if I can find where the connection is being dropped. I just don't want to wake up at 2 AM to do it. I would like to configure my trace file and schedule it to run.
Can anyone help?