Hi all,
on my network lab I am testing replications between different AD sites; everything seems to be Ok, Dc's are replicating regularly on the basis of schedules set on the site links objects, and Kcc service on each site has generated all connection objects for replication between sites.
But on right-clicking on each connection object, I've found out that a schedule is set automatically by the KCC both for "Intersite" and "Intrasite" connection objects.
Honestly I thought that connection schedule control was pertaining to INTRASITE connections only, but since the same interface schedule is present also on INTERSITE connections this "finding" has really puzzled me; in fact it was my assumption that intersite replications are set and controlled by "site-link objects" but now I am not longer so sure abou it; so my questions is ..
Does Connection object schedule refer only to Intrasite Connection objects?
And as a result, are Intersite connection object schedules always overriden by site-link scheduling?
Thanks in advance for your help.
Leonardo
on my network lab I am testing replications between different AD sites; everything seems to be Ok, Dc's are replicating regularly on the basis of schedules set on the site links objects, and Kcc service on each site has generated all connection objects for replication between sites.
But on right-clicking on each connection object, I've found out that a schedule is set automatically by the KCC both for "Intersite" and "Intrasite" connection objects.
Honestly I thought that connection schedule control was pertaining to INTRASITE connections only, but since the same interface schedule is present also on INTERSITE connections this "finding" has really puzzled me; in fact it was my assumption that intersite replications are set and controlled by "site-link objects" but now I am not longer so sure abou it; so my questions is ..
Does Connection object schedule refer only to Intrasite Connection objects?
And as a result, are Intersite connection object schedules always overriden by site-link scheduling?
Thanks in advance for your help.
Leonardo