Same thing, yeah, but when you blend frames, I think you'll actually create new material between the frames and I didn't think you wanted that in your original question.
If you shorten a 5 minute clip to 1 minute, you'll throw out 4 of every 5 frames (as long as you don't use frame blending). If you shorten a 3-minute piece to 1-minute, you'll only show 1/3 of the clips.
Ah, I think I know what you want to do. Try this:
For a 3-minute scene, retime it such that it is one minute long (one third). Then export to sequential frames. Then adjust the single image import duration to 3 frames. Then import your folder full of frames and place the folder back on the timeline. Voila -- 3 minutes of 1/3 the video, but stretched. It's like watching the action using a strobe light, except fewer seizures!
Cheers,
![[monkey] [monkey] [monkey]](/data/assets/smilies/monkey.gif)
Edward
"Cut a hole in the door. Hang a flap. Criminy, why didn't I think of this earlier?!" -- inventor of the cat door