Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations Chriss Miller on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Scheduled Backup not Running

Status
Not open for further replies.

Darrenb

MIS
Jan 20, 2000
85
GB
I'm using the backup facility in Windows 2000 Server to backup the HDD to a DDS tape. It's scheduled to run at midnight every weeknight, and to overwrite the destination media if it's not a new tape.

The backup runs without any problems if a new tape is inserted. If you use a tape, which already contains data, it does not overwrite, and stops the backup from running. If I run the job manually, it overwrites the media without any problems. Why doesn't it overwrite the tape from a scheduled job?

When you insert a new tape you are automatically asked to prepare the tape for use as soon as the tape is inserted into the drive. Is there a way of making it prepare a used tape?

Any information would be gratefully received!

Darren
 
I had the same problem.

Checked technet and all it said was to install service pack 3 which didn't solve the problem.

In the end I had to set up the backups using the ntbackup command and create batch files for each day I wanted to run the backup. Also had to create a text file which tells the machine what I wanted to backup.
 
try using the /um option at the end of the backup command in Schedule task manager. A+, MCP, CCNA
marbinpr@hotmail.com

"I just know that I know nothing"
Socrates (469-399 B.C.E.)

 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top