hello,
When I schedule a backup, the log shows the job failed with the error, "no new media". I do daily b/u, with 5 tapes, so each tape is cycled, so every monday the tape will have last Mondays data, etc. I have selected "overwrite" and still the job fails. When setting up the job, is there a way to ignore the media label, or have the tape be treated as "new"?
I can run a manual job with these tapes, I just get the splash prompt about overwritting the tape.
I would prefer to do this from the MS Backup program, if possible.
When I schedule a backup, the log shows the job failed with the error, "no new media". I do daily b/u, with 5 tapes, so each tape is cycled, so every monday the tape will have last Mondays data, etc. I have selected "overwrite" and still the job fails. When setting up the job, is there a way to ignore the media label, or have the tape be treated as "new"?
I can run a manual job with these tapes, I just get the splash prompt about overwritting the tape.
I would prefer to do this from the MS Backup program, if possible.