needadvice
Programmer
I have a report on which I multiply the values in two text fields in a third field (text41) in an Access Report
Text41's Control Source =[text212]*[Text30].
The value in text212 is $4,550.
The value in Text30 is 55.921
My answer is $2,544.41. I need $2,544.40
How do I get rid of the extra penny?
No one here has figured this out. I checked other posts, but nothing seems to work.
Any Ideas?
Text41's Control Source =[text212]*[Text30].
The value in text212 is $4,550.
The value in Text30 is 55.921
My answer is $2,544.41. I need $2,544.40
How do I get rid of the extra penny?
No one here has figured this out. I checked other posts, but nothing seems to work.
Any Ideas?