I have a scheduled powerdown next weekend and I'm trying to understand what order to shutdown and then bring back up the equipment... my equipment is:
8700 server (active)
8700 server (standby)
MCC Cabinet
MN
MSS
MAS1
MAS2
Cajun Switches
Avaya UPS that attaches to MCC and also supplies power to above MM equipment.
8700 server (active)
8700 server (standby)
MCC Cabinet
MN
MSS
MAS1
MAS2
Cajun Switches
Avaya UPS that attaches to MCC and also supplies power to above MM equipment.