Currently I am using Peachtree Complete Accounting 9.0.
My problem is in assigning cost to the assembly items that have been built. I have gone through all the stock inventory items and assingned a cost to them. I expected the cost of the assembly items to be automatically calculated since the stock items that make up the assembly items have cost assinged to them?? Do I have to go through and manually assign cost to the assembly items?? Please help!
My problem is in assigning cost to the assembly items that have been built. I have gone through all the stock inventory items and assingned a cost to them. I expected the cost of the assembly items to be automatically calculated since the stock items that make up the assembly items have cost assinged to them?? Do I have to go through and manually assign cost to the assembly items?? Please help!