So far so good. However, and I may have verbiage incorrect, but each of my project names, say SMITH, is outdented followed by each of the tasks that need to be done - drywall, trim, etc. How do I get the SMITH name on every bar beside each of the tasks? So it would list SMITH, drywall, 18 days, Joe Blow Drywall Inc. I just can't get the SMITH on there and have to type it manually.