hey
this is what i want:
- I schedule a job, one job, that will run each day at predefined time. then, i want this job to be independent of a DAT Tape. I have tried numerous times and I cannot make single job to run on 2 or more different DAT Tapes, even if I label them with the same label. It is saying that the tape is not there, like the drive is loaded....when I put back the track I have created the job, the initial one, the job resumes working. is this a deficiency of ntbackup?
or please instruct where to look further for more info...a forum or something?
googling didnt provide much help...too much unrelated info for my case...
thanks.
this is what i want:
- I schedule a job, one job, that will run each day at predefined time. then, i want this job to be independent of a DAT Tape. I have tried numerous times and I cannot make single job to run on 2 or more different DAT Tapes, even if I label them with the same label. It is saying that the tape is not there, like the drive is loaded....when I put back the track I have created the job, the initial one, the job resumes working. is this a deficiency of ntbackup?
or please instruct where to look further for more info...a forum or something?
googling didnt provide much help...too much unrelated info for my case...
thanks.