Am looking at adding two IPE shelves to a column that already has a Meridian Mail Modular Option EC (2 shelves). Some documentation says that the mail system should be at the bottom where the air flow resides. Others say it should be up top. Anyone have the definite answer?
Thanks for the help.
Thanks for the help.