That's where it get's time consuming. Is there a way to take all the parts on the work ticket BOM without disbursing or handling each item on the BOM. Also, if the parts are not built to stock, materials for each part are being calculated for usage on each part and then disbursed. (our term for assigning materials used to a particular project.)