I am doing a sheet that will measure capacity on a production plan, I want to take the totals from selected cells and add them together in one cell on another sheet, can you help me with this, here is a sample line of the sheet..
TYPE MCN REQ TIME/MINS
20x121 300 150 6.00
12345 300 2000 5.00
34561 310 600 4.00
54321 330 500 7.00
On another sheet in one cell add the machine times for the 300 machine, The result would be 11.00 mins, does that make sense?
TYPE MCN REQ TIME/MINS
20x121 300 150 6.00
12345 300 2000 5.00
34561 310 600 4.00
54321 330 500 7.00
On another sheet in one cell add the machine times for the 300 machine, The result would be 11.00 mins, does that make sense?