Does anyone know how to schedule a duplicate job? I have 2 b2d jobs that run nightly and then I duplicate both to tape. The first duplicate job runs after the first b2d job and at the same time as the second b2d job. This probably slows down the second b2d job. I thought about a script, but haven't tried yet. The goal is to get the b2d jobs over with as fast as possible.