I have ArcServer 9.0 Build 2020 running on a Windows 2000 Server. Under Job Status, the Job Starts @ 12.30pm.
I manually reschedule this job to run @ 23.30pm each day.
How can I change this so that I dont have to manually change this each day?
Thanks,