merenakk11
Vendor
Hello,
I need a bit of help with a Crystal formula.
Basically, assume I have a date – call it KEYDATE (eg. 11 October 2007).
I then need to create future date fields that are based on this date, such that:-
The first date is the end of the KEYDATE month (31 October 2007),
The second date is the end of the next month (30 November 2007)
The third date is the end of the third month (31 December 2007)
The fourth date is the end of the fourth month (31 January 2008)
The fifth date is the end of the fifth month (29 February 2008)
And so on …
Please help,
Thank you,
Tiina
I need a bit of help with a Crystal formula.
Basically, assume I have a date – call it KEYDATE (eg. 11 October 2007).
I then need to create future date fields that are based on this date, such that:-
The first date is the end of the KEYDATE month (31 October 2007),
The second date is the end of the next month (30 November 2007)
The third date is the end of the third month (31 December 2007)
The fourth date is the end of the fourth month (31 January 2008)
The fifth date is the end of the fifth month (29 February 2008)
And so on …
Please help,
Thank you,
Tiina