I need to do a simple report for "jobs" completed between a parameter entered time period. I want to print and count four groups based on the turn-around-time from assigned date to completed date. The four groups would be 0-15 calendar days, 16-45 and 46 to 90 and >90. Is there a simple way to do my group via a simple day/date calculation??