Good evening....
Anyone using ES v9.5.700 and utilizing the ability to change the required ship date on line items by changing the ship date at the header level?
We utilize POP and pull items a great deal. We absolutely love the new functionality where it isn't necessary to touch the line items to update the dates....however, one unfinished thing we've noticed is that the start date/due date on the generated production orders does not get updated. Has anyone else run into that and did I miss something somewhere to have those updated as well?
Thanks
Jen
Anyone using ES v9.5.700 and utilizing the ability to change the required ship date on line items by changing the ship date at the header level?
We utilize POP and pull items a great deal. We absolutely love the new functionality where it isn't necessary to touch the line items to update the dates....however, one unfinished thing we've noticed is that the start date/due date on the generated production orders does not get updated. Has anyone else run into that and did I miss something somewhere to have those updated as well?
Thanks
Jen