Dim Resource Leveling option 1

Status
Not open for further replies.

Albion

IS-IT--Management
Joined
Aug 8, 2000
Messages
517
Location
US
Does anyone know if it is possible to Dim (not gives users the ability to change) the resource leveling option, and hard-code it? I know where the 0 and 1 is in the registry to toggle between auto and manual, but I want to make this option unavailable to general users. Anyone know if this can be done with a group policy or during the install?

Thanks!
 
Hello Albion,
I'm not aware of any option to do what you want. However, here is a possible work around.

Why not remove the menu item "Level Resources" from the "Tools" menu.

To do this "Tools" select "Customize" then click on the "Tools" menu scroll down to "Level Resources" and drag and drop the menu item off.

Hope this helps,

Michael
 
Storyteller,

That may be an option, since there seems to be no other way to lock it down. Thanks for the post!

 