Hi All
I need to install a new Definity G3siV10 B carrier onto a Processor carrier A carrier it is not a duplicated processor.
So far I have found that I need to do the following:
(i) Set Port Cabinet B (J58890H) on top of Control Cabinet A.
(ii) Remove the Time Division Multiplexing (TDM) Bus Terminator (AHF110) from Slot 18 of the Control Cabinet (Processor Port Network (PPN)) and move it to Slot 17 on the top Port Cabinet.
(iii) Connect the supplied Time Division Multiplexing (TDM) Bus Cables (WP-91716 L3) between slot 18 on the Processor carrier and slot 00 on carrier B
(iV) Set the carrier address on the B carrier with the jumpers (right hand vertical jumper)
Is the above process correct, if yes is there any Software changes that need to be made to complete the install and does the PBX require a reboot after the addition.
Thank you and look forward to your thoughts.
PBX
I need to install a new Definity G3siV10 B carrier onto a Processor carrier A carrier it is not a duplicated processor.
So far I have found that I need to do the following:
(i) Set Port Cabinet B (J58890H) on top of Control Cabinet A.
(ii) Remove the Time Division Multiplexing (TDM) Bus Terminator (AHF110) from Slot 18 of the Control Cabinet (Processor Port Network (PPN)) and move it to Slot 17 on the top Port Cabinet.
(iii) Connect the supplied Time Division Multiplexing (TDM) Bus Cables (WP-91716 L3) between slot 18 on the Processor carrier and slot 00 on carrier B
(iV) Set the carrier address on the B carrier with the jumpers (right hand vertical jumper)
Is the above process correct, if yes is there any Software changes that need to be made to complete the install and does the PBX require a reboot after the addition.
Thank you and look forward to your thoughts.
PBX