How long will arcserve wait by default for a tape mount request?
How do i alter/increase this default time?
I have a simple test environment with 1 tape drive and Arcserve 11.1r. I notice a merge operation I initiated on sequence 1 asked for sequence 2 (which i mounted) and then sequence 3. I wasn't around for the request and it looks like (by the activity log) that it gave up after about 25 minutes.
Does that sound right?
Can i increase it?
How?
How do i alter/increase this default time?
I have a simple test environment with 1 tape drive and Arcserve 11.1r. I notice a merge operation I initiated on sequence 1 asked for sequence 2 (which i mounted) and then sequence 3. I wasn't around for the request and it looks like (by the activity log) that it gave up after about 25 minutes.
Does that sound right?
Can i increase it?
How?