I'm trying to figure if in XI there is a possibility of implementing this report design. I know in CR8.5 it wasn't possible.
Plant Scheduled Category 1 Category 1
Hrs Hrs Percent
Plant1 XXX,XXX XXX,XXX XXX.XX%
Plant2 XXX,XXX XXX,XXX XXX.XX%
Totals X,XXX,XXX X,XXX,XXX XXX.XX%
Its basically a crosstab with percentages. I'd create a manual crosstab, but I don't know how many categories I'll have for the columns. The system allows users to add/remove these at will.
Plant Scheduled Category 1 Category 1
Hrs Hrs Percent
Plant1 XXX,XXX XXX,XXX XXX.XX%
Plant2 XXX,XXX XXX,XXX XXX.XX%
Totals X,XXX,XXX X,XXX,XXX XXX.XX%
Its basically a crosstab with percentages. I'd create a manual crosstab, but I don't know how many categories I'll have for the columns. The system allows users to add/remove these at will.