Hello,
I have test machine upgrated to 9.2.0.6 from 9.2.0.3. Production is still running 9.2.0.3.
I need to copy a DB from production to test. Can I just copy all data files over for a new DB (using backup control file script) and then run startup migrate as the instruction of upgrade from 9.2.0.3 to 9.2.0.6?
Thank you very much in advance for your input.
I have test machine upgrated to 9.2.0.6 from 9.2.0.3. Production is still running 9.2.0.3.
I need to copy a DB from production to test. Can I just copy all data files over for a new DB (using backup control file script) and then run startup migrate as the instruction of upgrade from 9.2.0.3 to 9.2.0.6?
Thank you very much in advance for your input.