Hi All,
I'm a student taking an industrial placement at a firm and my boss just asked me to make a terminal connection with this cisco switch (a catalyst 2900) and install two 2931 Gigabit modules.
I've done the installation of the modules, I've esablished a termial connection and I have a command prompt:
4s-c2916-16>
Now, how do I check that the two Gigabit modules work? (ie. That me, the newbie didn't make some terrible mistake in installing them!!) I have tried "sh ver", but it doesn't mention anything about these two modules being connected correctly.
Any sugegstions are very welcome ;-)
Thank you,
James.
I'm a student taking an industrial placement at a firm and my boss just asked me to make a terminal connection with this cisco switch (a catalyst 2900) and install two 2931 Gigabit modules.
I've done the installation of the modules, I've esablished a termial connection and I have a command prompt:
4s-c2916-16>
Now, how do I check that the two Gigabit modules work? (ie. That me, the newbie didn't make some terrible mistake in installing them!!) I have tried "sh ver", but it doesn't mention anything about these two modules being connected correctly.
Any sugegstions are very welcome ;-)
Thank you,
James.