Hi!
I have a report that is scheduled to run nightly through BCA. Right now it is a pretty new report, so I get requests to change it at least once a day. It is really time consuming to have to reschedule the report every time I make a change. I don't change the name of the report, I just change something in it, such as replace an object.
Is there any way that I can make changes without haveing to go through the hassle of re-scheduling the report every time there is a change?
thanks
I have a report that is scheduled to run nightly through BCA. Right now it is a pretty new report, so I get requests to change it at least once a day. It is really time consuming to have to reschedule the report every time I make a change. I don't change the name of the report, I just change something in it, such as replace an object.
Is there any way that I can make changes without haveing to go through the hassle of re-scheduling the report every time there is a change?
thanks