hi all,
im having a problem with my Arcserve 9 backup.
im using a 5-days weekly rotation schcema, with full backup on friday, no backup on weekend and incremental backups on weekdays.
im using a HP surestore 220MX optical library, but she's not a problem.
on weekdays, incremental backups are ok. on friday, when a full backup is done, everything is backed up correctly, the backup lasts till saturday night and finishes correctly to status "finished". the last log entry is "Reschedule Backup job for ...." - next monday - which is also written to "execution time" column in job status.
but on monday - nothing happens. the situation remains until i restart the server. after the restart, the missed job automaticaly starts and since that, everything is ok until next monday.
has anybody noticed such a behavior?
thank you, Ronald
im having a problem with my Arcserve 9 backup.
im using a 5-days weekly rotation schcema, with full backup on friday, no backup on weekend and incremental backups on weekdays.
im using a HP surestore 220MX optical library, but she's not a problem.
on weekdays, incremental backups are ok. on friday, when a full backup is done, everything is backed up correctly, the backup lasts till saturday night and finishes correctly to status "finished". the last log entry is "Reschedule Backup job for ...." - next monday - which is also written to "execution time" column in job status.
but on monday - nothing happens. the situation remains until i restart the server. after the restart, the missed job automaticaly starts and since that, everything is ok until next monday.
has anybody noticed such a behavior?
thank you, Ronald