Hi everyone. This is just a shot in the dark but here's what I got.
We have this system called Mattec that keeps track of our production. It's based on SQL server. I'm not sure what version. I'm trying to make a report in access using some of the data in the system. When I bring the a date/time field into Access it looks like this. 978595471. I need to convert that into a proper date and time. Does anyone know what I'm talking about or run into something similar when working with SQL Server?
Thanks,
Jason
We have this system called Mattec that keeps track of our production. It's based on SQL server. I'm not sure what version. I'm trying to make a report in access using some of the data in the system. When I bring the a date/time field into Access it looks like this. 978595471. I need to convert that into a proper date and time. Does anyone know what I'm talking about or run into something similar when working with SQL Server?
Thanks,
Jason