Hi, I want to add LIM to a BC9 CNI82 system of beyond 11 LIMs.
I have made some tests in laboratory, adding LIM to a system of 3 LIMs, same release BC9. I have followed the indications in the dynatext and have used the LIM disposition table "LIM>11".
I have not redistributed the common functions program units, i.e. no common functions program units are loaded in the added lim 4 (like if it were lim number 18).
This i the procedure that I've followed:
Created on the disc REL1 and REL2 (DUSYI) (3LIMs exchange)
Create on disc also INL (DUSII)
Connected LIM 4 to GS
Switched on LIM controlling that display card goes to 3120
Sent the lim disposition table to new lim (CNLDI and CNLDT)
Verified the OK of CNLDT (Display Card 51)
Loaded the units with program with LAPUT
first message: LOADING INFORMATIONS (display card 6x)
LOADING WAS SUCCESFULL
third message: WAIT FOR START INFORMATION (display card 99, 100, 105, 101)
fourth message: SPONTANEOUS PRINTOUT
START PHASE 1, 1,3 AND PHASE 1,5 READY
STARTED LIM: S FAILED LIM: S PARTLY FAILED LIM: S FAILED PU: S
1
2
3
4
Initialized connection with GJLII
Date and time with CATII
then GJLCP, GJLSP, SCICP
then SFLII (DispCard 103)
DUSYI
Configurated extensions on LIM4 (EXTEI)
DUSYI
It seems all OK, but a strange phrase was in ambush in dyna: "Is there a function with mutual exchange data in all the LIMs, where the data for the functions is not initiated in the added LIM, at an initial start?"
and then
"example of functions:
- Traffic Measurement Data
- Call Diversion data
- Traffic group matrix data
- System Data
- Night service data
- Message waiting data
- Application system parameter data "
In fact:
I've prepared the 3 LIMs exchange with Night Service (NSCOI) and NASCS:ANS=801;
Well: the code 801 doesn't work for LIM4 extensions.
Dyna says "remove and reinitiate data for the function..", but NASCR doesn't work: FAULTY INTERRUPT, and the system reloads.
Perhaps i have to reinitialize these data before configure extension (EXTEI) on LIM4 (?).
I've also noted that CIL doesn't work for LIM4 extension.
Call diversion (CDINI) works after a RFEXI (but is not required for dyna procedure!)
argh!!![[mad] [mad] [mad]](/data/assets/smilies/mad.gif)
which are exactly "functions with mutual exchange data"?
I've noted B1 of parameter TYPE in CNPIP: it seems that B1=1 is equal to "program unit of function with mutual exchange data".
Is It True?
Can I use LADCI in this situation (addition of lim)?
My last questions are:
which is the correct procedure for addition of lim, where no common functions are loaded in the added lim (is it corrected what I have made)?
Which are exactly the functions with mutual exchange data?
Which it is the way in order to manage the functions with mutual exchange data?
Sorry for my english and thanks to all!
GioBs
![[peace] [peace] [peace]](/data/assets/smilies/peace.gif)
I have made some tests in laboratory, adding LIM to a system of 3 LIMs, same release BC9. I have followed the indications in the dynatext and have used the LIM disposition table "LIM>11".
I have not redistributed the common functions program units, i.e. no common functions program units are loaded in the added lim 4 (like if it were lim number 18).
This i the procedure that I've followed:
Created on the disc REL1 and REL2 (DUSYI) (3LIMs exchange)
Create on disc also INL (DUSII)
Connected LIM 4 to GS
Switched on LIM controlling that display card goes to 3120
Sent the lim disposition table to new lim (CNLDI and CNLDT)
Verified the OK of CNLDT (Display Card 51)
Loaded the units with program with LAPUT
first message: LOADING INFORMATIONS (display card 6x)
LOADING WAS SUCCESFULL
third message: WAIT FOR START INFORMATION (display card 99, 100, 105, 101)
fourth message: SPONTANEOUS PRINTOUT
START PHASE 1, 1,3 AND PHASE 1,5 READY
STARTED LIM: S FAILED LIM: S PARTLY FAILED LIM: S FAILED PU: S
1
2
3
4
Initialized connection with GJLII
Date and time with CATII
then GJLCP, GJLSP, SCICP
then SFLII (DispCard 103)
DUSYI
Configurated extensions on LIM4 (EXTEI)
DUSYI
It seems all OK, but a strange phrase was in ambush in dyna: "Is there a function with mutual exchange data in all the LIMs, where the data for the functions is not initiated in the added LIM, at an initial start?"
and then
"example of functions:
- Traffic Measurement Data
- Call Diversion data
- Traffic group matrix data
- System Data
- Night service data
- Message waiting data
- Application system parameter data "
In fact:
I've prepared the 3 LIMs exchange with Night Service (NSCOI) and NASCS:ANS=801;
Well: the code 801 doesn't work for LIM4 extensions.
Dyna says "remove and reinitiate data for the function..", but NASCR doesn't work: FAULTY INTERRUPT, and the system reloads.
Perhaps i have to reinitialize these data before configure extension (EXTEI) on LIM4 (?).
I've also noted that CIL doesn't work for LIM4 extension.
Call diversion (CDINI) works after a RFEXI (but is not required for dyna procedure!)
argh!!
![[mad] [mad] [mad]](/data/assets/smilies/mad.gif)
which are exactly "functions with mutual exchange data"?
I've noted B1 of parameter TYPE in CNPIP: it seems that B1=1 is equal to "program unit of function with mutual exchange data".
Is It True?
Can I use LADCI in this situation (addition of lim)?
My last questions are:
which is the correct procedure for addition of lim, where no common functions are loaded in the added lim (is it corrected what I have made)?
Which are exactly the functions with mutual exchange data?
Which it is the way in order to manage the functions with mutual exchange data?
Sorry for my english and thanks to all!
GioBs
![[peace] [peace] [peace]](/data/assets/smilies/peace.gif)