We have a short term requirement (e.g. next 6 months) to periodically move some data held in an Access database into an Oracle database.
Although other solutions may well be available (e.g. ODBC links, etc.), my intention was to generate the appropriate SQL code (to embrace the required data) necessary to create the table directly into Oracle.
Has anyone used this technique (or will I be forced to look at something like DTS to achieve the transfer) ?
Although other solutions may well be available (e.g. ODBC links, etc.), my intention was to generate the appropriate SQL code (to embrace the required data) necessary to create the table directly into Oracle.
Has anyone used this technique (or will I be forced to look at something like DTS to achieve the transfer) ?