I have a netware 4.11 server (SP 9, DS 6.21, DSREPAIR 4.73a)that runs Groupwise 5.26, DNS 4.01a (Unicon 5.18), DHCP 2.10r, PSERVER 5.00, is a Norton Antivirus distribution server, and has a couple of volumes for file storage. I need to migrate to a new IBM x235 with NW5.1, and then in place upgrade to NW6. There is one other NW4.11 server running a Groupwise mail gateway. My thoughts are to down the Gateway so as not to be updating mailboxes while the migration is in progress. I also want to stop Norton, Powerchute (UPS Monitor), and Backup Exec from the server to be migrated. Is this a good course of action? Should I unload the Print Server and Groupwise also or should I leave everything running? Eventually the IBM Netfininty 5500 that is being migrated will in turn replace the antique that is now the Gateway. I have already tried this operation four times on one weekend with no success (the servers seemed to lose communication with each other during the early part of the process and hang). They are on separate ports of a Cisco WS-C2924-XL switch. I now think it was a reference to a test server that doesn't exist any longer. It has been deleted through NDSMGR32 (it would not delete from NDSMGRNT). When I do this again (it will be an all nighter to start a weekend), I want to have all bases covered. Sorry to ramble on. Any suggestions are appreciated.