Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
(OP)
The runs come from a communication room (IDF) via cable tray that is grounded from busbar. Then the runs exit the cable tray supported by J-Hooks into 1" EMT pipe through the wall, 10ft of EMT. The inspector is requiring that we attach a grounding bushing to the 10ft EMT, that must get grounding from the telco busbar. Where in NEC or Bicsi is this requirement? Or a reference to Grounding and bonding requirements of communications metal conduits within a building? Thank you in advance!
RE: Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
RE: Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
Also, did you look at TIA-607?
Best Regards,
Scott
MSc ISM, MIET, MASHRAE, CDCP, CDCS, CDCE, CTDC, CTIA, ATS
"I try to be nice, but sometimes my mouth doesn't cooperate."
RE: Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
RE: Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
Agree, but since it seemed like someone was making up their own rules, I was suggesting that it was another possibility of where the "requirement" might have come from.
Best Regards,
Scott
MSc ISM, MIET, MASHRAE, CDCAP, CDCP, CDCS, CDCE, CTDC, CTIA, ATS
"I try to be nice, but sometimes my mouth doesn't cooperate."
RE: Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
RE: Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
https://www.bicsi.org/education-certification/educ...
RE: Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.
RE: Grounding and Bonding Requirements on 1" EMT Pipe for CAT6 runs.