securityforums
IS-IT--Management
Hi there
I currently have two jobs, one which runs daily which seems to work fine. The second is an archive which I run twice a week. I have setup two slots of my DLT to be under a new group, GROUP1 rather than 0.
The job is scheduled to run but always fails with
W3831 Unable to find any media.
In the backup options I have ticked:
Overwrite same media name, or blank media then ANY media
(the same as my daily backup which works fine)
The problem seems to be that under device manager the tapes arent listed.
I can make the backup work if I do a MOUNT / DISMOUNT or an inventory but why do I have do to this???
I dont have to do this with the daily backups, it does take quite a while to actually perform this operation on a 7 tape DLT autoloader.
Is there anyway to stop having to to this every time for the archive backup on group1, as I dont have to do it with the daily. Maybe a way of auto scheduling one of these before the archive?
I currently have two jobs, one which runs daily which seems to work fine. The second is an archive which I run twice a week. I have setup two slots of my DLT to be under a new group, GROUP1 rather than 0.
The job is scheduled to run but always fails with
W3831 Unable to find any media.
In the backup options I have ticked:
Overwrite same media name, or blank media then ANY media
(the same as my daily backup which works fine)
The problem seems to be that under device manager the tapes arent listed.
I can make the backup work if I do a MOUNT / DISMOUNT or an inventory but why do I have do to this???
I dont have to do this with the daily backups, it does take quite a while to actually perform this operation on a 7 tape DLT autoloader.
Is there anyway to stop having to to this every time for the archive backup on group1, as I dont have to do it with the daily. Maybe a way of auto scheduling one of these before the archive?