Hello everybody,
I use ciscoworks 2000 and I have to change two catalyst 4506.
In fact, I will put two 4510R in replacement.
So I want to know if I have to unmanage my switches or delete them before re-adding them.
Is there a correct solution to do that ?
Thanks in advance and I apoogize for my poor english...
I use ciscoworks 2000 and I have to change two catalyst 4506.
In fact, I will put two 4510R in replacement.
So I want to know if I have to unmanage my switches or delete them before re-adding them.
Is there a correct solution to do that ?
Thanks in advance and I apoogize for my poor english...