golfdoctor
Technical User
We are in the process of going from Rlse 5.5 to 7.5 on a Succesion 1000M (multi-group). My concern is our PRI's. Presently using QPC720 cards with no issues. Avaya says they won't work and should not have worked at 5.5. Reviewing thread 798-1550366 and thread 798-1508402. Will change the T1's to the NT5D12 Dual PRI cards before the actual Release 7.5 upgrade occurs.
Present configuration is;
(qty 2) MSDL cards for T1's -provides DCH's-spare ports available both cards.
(qty 2) QPC414 cards for T1's - Loop 1 and loop 16 and 17 respectively. Loop 0 is not connected (old mermail)
(qty 3) QPC720 cards - located on a power shelf
Common Equipment print out:
CEQU
MPED 8D
TERM
REMO
TERD
REMD
TERQ
REMQ
SUPL 004 008 012 020
024 028 036 040
N080 V152 V156 V160
SUPC
SUPF
XCT 002 018 032 048
TDS * 002 * 018 * 032 * 048
CONF * 003 * 019 * 033 * 049
MFSD * 002 * 018 * 032 * 048
DLOP NUM DCH FRM TMDI LCMT YALM TRSH
PRI 001 24 ESF NO B8S FDL 00
016 24 ESF NO B8S FDL 00
017 24 ESF NO B8S FDL 00
MISP
EXT0 3PE
CNI 009 000 000
CNI 009 001 001
EXT1 3PE
CNI 009 000 000
CNI 009 001 001
MCFN 509 MB
My question is it better to install the new T1's (NT5D12) in the old QPC 414 slots and change the DCH, clock and PRI (telco)cabling connections as appropriate (hopefully do-able during next maintence period)or is it better to build a new PRI route, DCH's etc and put the new T1's in a different loop and cut things over during the next maintence period. I believe the first scenario would be the easiest if it is do-able. Have not had to deal with PRI installs before so I am looking for any suggestions to help me determine the easiest/safest method especially if things go south.
Any thoughts would be appreciated.....
TGD
Present configuration is;
(qty 2) MSDL cards for T1's -provides DCH's-spare ports available both cards.
(qty 2) QPC414 cards for T1's - Loop 1 and loop 16 and 17 respectively. Loop 0 is not connected (old mermail)
(qty 3) QPC720 cards - located on a power shelf
Common Equipment print out:
CEQU
MPED 8D
TERM
REMO
TERD
REMD
TERQ
REMQ
SUPL 004 008 012 020
024 028 036 040
N080 V152 V156 V160
SUPC
SUPF
XCT 002 018 032 048
TDS * 002 * 018 * 032 * 048
CONF * 003 * 019 * 033 * 049
MFSD * 002 * 018 * 032 * 048
DLOP NUM DCH FRM TMDI LCMT YALM TRSH
PRI 001 24 ESF NO B8S FDL 00
016 24 ESF NO B8S FDL 00
017 24 ESF NO B8S FDL 00
MISP
EXT0 3PE
CNI 009 000 000
CNI 009 001 001
EXT1 3PE
CNI 009 000 000
CNI 009 001 001
MCFN 509 MB
My question is it better to install the new T1's (NT5D12) in the old QPC 414 slots and change the DCH, clock and PRI (telco)cabling connections as appropriate (hopefully do-able during next maintence period)or is it better to build a new PRI route, DCH's etc and put the new T1's in a different loop and cut things over during the next maintence period. I believe the first scenario would be the easiest if it is do-able. Have not had to deal with PRI installs before so I am looking for any suggestions to help me determine the easiest/safest method especially if things go south.
Any thoughts would be appreciated.....
TGD