Has anyone had experience with upgrading Supervisor II to Supervisor III modules on a 4006 switch.
The 4006 currently in use with the Sup II is showing 45% use (show proc).
Is it just a case of saving config file to a tftp server and then copying it back to the new Sup III ?
Do I have to configure certain things first on the new card before I can restore the saved config file to it ?
I have the luxury of having the Sup III installed in a spare 4006 chassis, test lab scenario, whilst Sup II still in live environment.
The 4006 currently in use with the Sup II is showing 45% use (show proc).
Is it just a case of saving config file to a tftp server and then copying it back to the new Sup III ?
Do I have to configure certain things first on the new card before I can restore the saved config file to it ?
I have the luxury of having the Sup III installed in a spare 4006 chassis, test lab scenario, whilst Sup II still in live environment.