Hello,
I have a tapelibrary with 2 drives using Arcserve v9. When I run the backup it only uses one drive at a time using 15 tapes. How can I have it use both drives at the sam time?
Thanks,
With BrightStor 10.5 you can use multistreaming.
Then one master job will be devided into separate slave jobs, depending on the amount of drives you have configured.
For multistreaming check the manuals on this.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.